| 1 |
Product Definition |
Confirm whether the supplier manufactures true vacuum insulating glass rather than conventional double glazing with air or inert gas. |
Vacuum insulating glass uses a sealed evacuated cavity, commonly supported by microscopic pillars to resist atmospheric pressure. |
Technical datasheet, cross-section drawing, production photographs, and independent test reports. |
10% |
| 2 |
Thermal Performance |
Review the center-of-glass thermal transmittance and verify the test conditions used for the reported value. |
High-performance vacuum glazing is generally selected for very low center-of-glass U-values; the exact result depends on glass thickness, coatings, cavity design, spacer, and test method. |
Laboratory report showing U-value, specimen configuration, temperature conditions, and applicable standard. |
15% |
| 3 |
Solar and Light Performance |
Compare visible light transmittance, solar factor, and low-emissivity coating options for the intended climate and building orientation. |
A lower U-value does not automatically provide the best daylight or solar-control performance; the complete optical specification must be reviewed. |
Spectral data, optical calculation, coating description, and project-specific energy simulation. |
8% |
| 4 |
Vacuum Stability |
Assess sealing technology, getter design, edge protection, and the method used to monitor cavity pressure during production. |
Long-term performance depends on maintaining the vacuum and limiting gas permeation through the seal and edge system. |
Aging test results, seal construction details, cavity-pressure records, and warranty conditions. |
15% |
| 5 |
Glass Configuration |
Check available glass types, thickness combinations, low-emissivity coatings, laminated options, tempered options, and safety configurations. |
The final product must comply with the required safety, impact, wind-load, acoustic, and thermal specifications of the project. |
Approved product drawings, glass processing certificates, samples, and structural calculations. |
10% |
| 6 |
Acoustic Performance |
Request sound-reduction data for the exact glass composition instead of relying on a general product claim. |
Acoustic performance varies with pane thickness, lamination, cavity design, frame system, and installation quality. |
Certified sound-transmission test report and installation recommendations. |
7% |
| 7 |
Manufacturing Capability |
Verify whether the supplier controls cutting, coating handling, evacuation, sealing, inspection, and packing in-house or through subcontractors. |
A dedicated production process and documented quality-control checkpoints reduce variation between batches. |
Factory audit, process flow chart, equipment list, production capacity statement, and quality-control records. |
12% |
| 8 |
Standards and Testing |
Check whether the product and factory quality system can meet the standards required in the destination market. |
Relevant requirements may include national building codes, safety-glazing rules, thermal testing, durability testing, and quality-management procedures. |
Current certificates, accredited laboratory reports, inspection plans, and traceability documents. |
10% |
| 9 |
Customization and Tolerances |
Evaluate maximum and minimum sizes, shape limitations, hole and notch processing, dimensional tolerances, and compatibility with the frame system. |
Vacuum glass is a precision product; dimensional accuracy and edge quality are important for glazing, sealing, and transport. |
Tolerance schedule, shop drawings, sample approval procedure, and inspection records. |
6% |
| 10 |
Packaging and Logistics |
Review export packaging, crate design, moisture protection, loading method, shipping documents, and damage-claim procedures. |
Glass should be secured against movement, edge impact, moisture, and repeated handling during international transport. |
Packing specifications, loading photographs, shipment insurance details, and delivery inspection procedure. |
5% |
| 11 |
Commercial Terms |
Compare quotation validity, minimum order quantity, tooling or sample charges, payment terms, lead time, and replacement policy. |
The lowest unit price may not represent the lowest total cost when testing, packaging, freight, installation, and warranty risks are included. |
Detailed quotation, pro forma invoice, production schedule, warranty document, and total-cost comparison. |
7% |
| — |
Total Evaluation Weight |
Use a weighted score after verifying documents, samples, factory capability, and project-specific requirements. |
A supplier should be selected on verified performance, quality consistency, technical support, and total delivered cost rather than price alone. |
Completed supplier audit and approved sample evaluation. |
100% |